Skip to main content
Union Estimating
Estimating Services›Special Construction

Special Construction
Estimating Services

Professional estimating for modular and pre-engineered structures, clean rooms, shielded enclosures, aquatic facilities, specialty enclosures, and other special construction scopes. Quantity-only and cost-estimate packages. 48–72 hour turnaround.

Modular StructuresPre-Engineered BuildingsClean RoomsRF/EMI ShieldingAquatic FacilitiesSpecialty Enclosures48–72 Hr TurnaroundAll 50 States
48–72 hrs

Standard Turnaround

Spec

Driven Accuracy

All 50

States Covered

100%

Drawing-Referenced

What's Included

Complete Special Construction Takeoff

Every special construction takeoff is 100% drawing-referenced — every modular unit, panel, enclosure component, and specialty system item tied to a specific drawing, specification, or equipment schedule.

Modular & Pre-Engineered Structures

Module counts, panel SF, structural frame tonnage, and connection hardware from manufacturer drawings and specifications.

Clean Rooms & Controlled Environments

Wall panel SF, ceiling grid SF, air lock unit counts, pass-through counts, and HVAC interface quantities from clean room drawings.

RF/EMI Shielded Enclosures

Shielded room SF, panel counts, door and penetration counts, and filter/waveguide unit counts from shielding specifications.

Aquatic Facilities & Pools

Pool shell SF, gutter LF, deck SF, mechanical room equipment counts, and specialty finish quantities from aquatic drawings.

Specialty Enclosures & Vaults

Vault panel counts, blast-resistant wall SF, ballistic panel SF, and specialty door counts from enclosure drawings.

Excel Workbook + Annotated PDF Markups

All quantities organized by CSI division and system, with annotated markups showing every counted item.

Why Choose Us

The Union Estimating Difference

Spec-Driven Quantities

Special construction scopes are specification-heavy. We read manufacturer specs, performance specs, and shop drawing packages — not just floor plans.

System-by-System Organization

Each special construction system is quantified and organized separately — clean room, shielding, aquatic, and modular quantities never mixed.

Fixed Fee Before We Start

We quote a firm fee after reviewing your drawings. No hourly billing, no scope creep surprises.

Quantity-Only or Cost Estimate

Receive measured quantities only, or add agreed material and labor pricing from our proprietary database and current supplier quotes.

48–72 Hour Turnaround

Standard delivery within 48–72 hours. Rush available. Contact us with your bid date.

Nationwide Coverage

We serve contractors, owners, and developers across all 50 states — any project size, any special construction scope.

Project Types

Estimates for Every Project

Modular Building Systems
Pre-Engineered Metal Buildings
Clean Rooms (ISO Class 1–8)
Pharmaceutical & Biotech Facilities
RF/EMI Shielded Rooms
Data Center Enclosures
Aquatic Centers & Pools
Natatoriums
Blast-Resistant Structures
Ballistic-Resistant Enclosures
Government & Federal
Industrial Special Construction

Scope Boundaries

Inclusions & Exclusions

Included

  • Modular and pre-engineered structure quantities (module counts, panel SF, frame tonnage)
  • Clean room and controlled environment quantities (wall/ceiling SF, air lock counts)
  • RF/EMI shielded enclosure quantities (SF, panel counts, penetration counts)
  • Aquatic facility quantities (pool shell SF, deck SF, gutter LF, equipment counts)
  • Specialty enclosure and vault quantities (panel counts, door counts, blast/ballistic SF)
  • Excel workbook + annotated PDF markups

Excluded

  • System design, engineering, and performance specification development
  • Manufacturer shop drawing preparation
  • Installation and commissioning
  • Costs and labor rates (quantity-only package — pricing package available)

Delivery Packages

Quantity-Only or Cost Estimate

Two delivery packages available. Quantity-Only delivers measured quantities with no pricing. Cost Estimate adds agreed material and labor pricing using our proprietary database and current supplier/vendor quotes — all assumptions documented.

Quantity-Only Package

  • All measured quantities in Excel — LF, SF, CY, unit counts by type
  • Annotated PDF markups showing every counted item
  • No pricing, no labor rates — quantities only
  • Use with your own pricing or subcontractor quotes

Cost Estimate Package

  • Quantity-Only: SF, unit counts, and annotated markups — no pricing
  • Cost Estimate: material pricing from proprietary DB + current supplier/vendor quotes
  • Labor pricing based on trade productivity and documented wage assumptions
  • Subcontractor budget allowances for specialty systems where applicable
  • RSMeans used only for government/DOB work where required by scope agreement

How It Works

Four Steps to Your Takeoff

01

Upload Drawings

Submit your drawings and specifications through our contact form. PDF, CAD, Revit, and most other formats accepted.

02

Fixed-Fee Quote

We review scope and provide a firm fee before starting. No hourly billing, no surprises.

03

Takeoff & Review

We measure every quantity from your drawings and verify against schedules and specifications.

04

Delivery

Excel workbook with annotated PDF markups — delivered within 48–72 hours of approval.

FAQ

Special Construction Estimating Questions

Get Started

Ready for Your Special Construction Takeoff?

Upload your drawings and specifications and get a fixed-fee quote within a few hours. No commitment required.

Request a Free Quote