Skip to main content
Union Estimating
Estimating Services›Demolition

Demolition
Estimating Services

Professional demolition estimating and quantity takeoff — selective demolition, structural demolition, MEP demolition, site clearing, and hazardous material abatement allowances. Phase-by-phase accuracy from demolition drawings. 48–72 hour turnaround.

Selective DemolitionStructural DemolitionMEP DemolitionSite ClearingAbatement AllowancesPhased Demolition48–72 Hr TurnaroundAll 50 States
48–72 hrs

Standard Turnaround

Phase

By Phase Accuracy

All 50

States Covered

100%

Drawing-Referenced

What's Included

Complete Demolition Takeoff

Every demolition takeoff is 100% drawing-referenced — every wall, floor, ceiling, and MEP system to be removed tied to a specific demolition plan or phasing drawing.

Selective Demolition Quantities

SF of walls, floors, and ceilings to be removed — by assembly type (drywall, CMU, concrete, tile). LF of partitions, SF of flooring, and unit counts for fixtures and equipment.

Structural Demolition

CY of concrete to be demolished, tonnage of structural steel to be removed, LF of masonry walls — organized by structural element and floor level.

MEP Demolition Scope

LF of pipe, conduit, and ductwork to be removed — by system type. Equipment counts for HVAC units, panels, fixtures, and devices to be demolished.

Hazardous Material Abatement Allowances

SF of suspected ACM (asphalt tile, pipe insulation, drywall joint compound) and LF of lead-painted surfaces — noted as allowances pending survey results. Actual abatement quantities require a certified survey.

Site Clearing & Demolition

SF of pavement to be removed, CY of bulk demolition debris, unit counts for structures to be demolished — from civil and demolition plans.

Excel Workbook + Annotated Markups

Quantities in Excel organized by demolition phase and floor level — with annotated PDF markups tied to demolition plans and phasing drawings.

Why Choose Us

The Union Estimating Difference

Demolition Plan Reading

We read demolition plans, phasing drawings, and existing condition documents to identify exactly what is to be removed — not what is to remain.

Abatement Clearly Separated

Hazardous material abatement quantities are listed as allowances pending a certified survey — never presented as confirmed quantities without survey data.

MEP Demolition Included

Mechanical, electrical, and plumbing demolition quantities are included when MEP demolition drawings are supplied — one complete demolition takeoff.

Fixed-Fee Quote Before Work Begins

We review your drawings and provide a firm fee before starting. No hourly billing, no surprises.

48–72 Hour Standard Turnaround

Most demolition takeoffs are delivered within 48 to 72 hours. Rush delivery available.

Abatement Testing Excluded

We quantify from your supplied drawings. Hazardous material surveys, testing, and abatement design are not included.

Project Types

Estimates for Every Project

Tenant Improvements & Renovations
Building Gut Rehabilitation
Structural Demolition
Site Clearing & Grading
Industrial Facility Demolition
Healthcare Renovation
School & Education Renovation
Government & Federal
Historic Preservation Projects
Parking Structure Demolition
Bridge & Infrastructure
Phased Occupied Renovation

Scope Boundaries

Inclusions & Exclusions

Included

  • Selective demolition (SF of walls, floors, ceilings by material and assembly)
  • Structural demolition (CY of concrete, tonnage of steel from structural drawings)
  • MEP demolition (LF of pipe, conduit, ductwork to be removed)
  • Debris and waste quantities (CY estimated from demolition scope)
  • Abatement allowance quantities (SF/LF noted where hazmat is indicated)
  • Excel workbook + annotated PDF markups

Excluded

  • Hazardous materials testing and abatement design
  • Permitting and regulatory compliance
  • Installation and commissioning
  • Costs and labor rates (quantity-only package — pricing package available)

Delivery Packages

Quantity-Only or Cost Estimate

Two delivery packages available. Quantity-Only delivers measured quantities with no pricing. Cost Estimate adds agreed material and labor pricing using our proprietary database and current supplier/vendor quotes — all assumptions documented.

Quantity-Only Package

  • All measured quantities in Excel — LF, SF, CY, unit counts by type
  • Annotated PDF markups showing every counted item
  • No pricing, no labor rates — quantities only
  • Use with your own pricing or subcontractor quotes

Cost Estimate Package

  • Quantity-Only: SF, CY, LF, and annotated markups — no pricing
  • Cost Estimate: material/disposal pricing from proprietary DB + current contractor quotes
  • Labor pricing based on trade productivity and documented wage assumptions
  • Subcontractor budget allowances for specialty abatement where indicated
  • RSMeans used only for government/DOB work where required by scope agreement

How It Works

Four Steps to Your Takeoff

01

Upload Drawings

Submit your drawings and specifications through our contact form. PDF, CAD, Revit, and most other formats accepted.

02

Fixed-Fee Quote

We review scope and provide a firm fee before starting. No hourly billing, no surprises.

03

Takeoff & Review

We measure every quantity from your drawings and verify against schedules and specifications.

04

Delivery

Excel workbook with annotated PDF markups — delivered within 48–72 hours of approval.

FAQ

Demolition Estimating Questions

Get Started

Ready for Your Demolition Takeoff?

Upload your demolition drawings and get a fixed-fee quote within a few hours. No commitment required.

Request a Free Quote