Skip to main content
Union Estimating
Estimating Services›Doors & Windows

Doors, Windows
& Glazing Estimating

Professional estimating for doors, frames, hardware, windows, curtainwall, storefront, and specialty glazing. Schedule-based accuracy — every door, frame, hardware group, and glass lite counted from your drawings and schedules. 48–72 hour turnaround.

Hollow Metal & Wood DoorsHardware SchedulesCurtainwall & StorefrontWindow SystemsSpecialty GlazingOverhead Doors48–72 Hr TurnaroundAll 50 States
48–72 hrs

Standard Turnaround

Schedule

Based Accuracy

All 50

States Covered

100%

Drawing-Referenced

What's Included

Complete Doors & Glazing Takeoff

Every doors and windows takeoff is 100% drawing-referenced — every door, frame, hardware group, and glass lite tied to a specific schedule or elevation sheet.

Door & Frame Schedule Takeoff

Hollow metal, wood, aluminum, and specialty doors — unit counts by door type, size, material, fire rating, and hardware group. Frame types (KD, welded, aluminum) counted separately.

Hardware Schedule Quantification

Hinges, locksets, closers, exit devices, door stops, and all hardware by hardware group — unit counts from the hardware schedule with keying notes.

Window & Curtainwall Takeoff

Aluminum storefront, curtainwall, and window wall systems — SF by system type and elevation. Mullion LF, glass SF by type (clear, tinted, low-e, spandrel), and sill/head conditions.

Glazing & Specialty Glass

Insulated glass units (IGU), laminated, tempered, and fire-rated glass — SF by lite size and specification. Skylights, glass floors, and specialty glazing counted separately.

Overhead & Specialty Doors

Sectional overhead, rolling steel, coiling grilles, fire doors, and blast doors — unit counts by type, size, and operation (manual, electric, high-speed).

Excel Workbook + Annotated Markups

Quantities in Excel organized by door/window schedule and elevation — with annotated PDF markups tied to floor plans, elevations, and hardware schedules.

Why Choose Us

The Union Estimating Difference

Schedule-Based Accuracy

We work directly from door schedules, window schedules, and hardware schedules — not from plan-view counts alone. Every item is cross-referenced to the schedule.

Hardware Group Tracking

Hardware is quantified by hardware group number so your bid matches the specification exactly — no generic hardware allowances.

Curtainwall & Storefront Expertise

We read curtainwall shop drawings and elevation drawings to quantify mullion systems, glass lites, and all perimeter conditions accurately.

Fixed-Fee Quote Before Work Begins

We review your drawings and provide a firm fee before starting. No hourly billing, no surprises.

48–72 Hour Standard Turnaround

Most door and window takeoffs are delivered within 48 to 72 hours. Rush delivery available.

Fabrication & Installation Excluded

We quantify from your supplied drawings and schedules. Fabrication, glazing installation, and hardware installation are not included.

Project Types

Estimates for Every Project

Commercial Office Buildings
Healthcare & Hospitals
Education & Schools
Retail & Mixed-Use
Industrial Facilities
Government & Federal
High-Rise Residential
Hospitality & Hotels
Tenant Improvements
Curtainwall Facades
Storefront Systems
Renovation & Replacement

Scope Boundaries

Inclusions & Exclusions

Included

  • Door and frame counts by type, size, and material from door schedules
  • Hardware sets by door number (leversets, closers, hinges, exit devices)
  • Curtainwall and storefront (SF by system type from elevation drawings)
  • Window counts by type and size from window schedules
  • Specialty glazing (SF — fire-rated, blast, bullet-resistant)
  • Excel workbook + annotated PDF markups

Excluded

  • Hardware specification and keying schedules
  • Installation and commissioning
  • Costs and labor rates (quantity-only package — pricing package available)

Delivery Packages

Quantity-Only or Cost Estimate

Two delivery packages available. Quantity-Only delivers measured quantities with no pricing. Cost Estimate adds agreed material and labor pricing using our proprietary database and current supplier/vendor quotes — all assumptions documented.

Quantity-Only Package

  • All measured quantities in Excel — LF, SF, CY, unit counts by type
  • Annotated PDF markups showing every counted item
  • No pricing, no labor rates — quantities only
  • Use with your own pricing or subcontractor quotes

Cost Estimate Package

  • Quantity-Only: unit counts, SF, and annotated markups — no pricing
  • Cost Estimate: material pricing from proprietary DB + current supplier/vendor quotes
  • Labor pricing based on trade productivity and documented wage assumptions
  • Subcontractor budget allowances for specialty glazing systems where applicable
  • RSMeans used only for government/DOB work where required by scope agreement

How It Works

Four Steps to Your Takeoff

01

Upload Drawings

Submit your drawings and specifications through our contact form. PDF, CAD, Revit, and most other formats accepted.

02

Fixed-Fee Quote

We review scope and provide a firm fee before starting. No hourly billing, no surprises.

03

Takeoff & Review

We measure every quantity from your drawings and verify against schedules and specifications.

04

Delivery

Excel workbook with annotated PDF markups — delivered within 48–72 hours of approval.

FAQ

Doors, Windows & Glazing Estimating Questions

Get Started

Ready for Your Doors & Windows Takeoff?

Upload your drawings and schedules and get a fixed-fee quote within a few hours. No commitment required.

Request a Free Quote